
How Japan Saves Time in Construction
10,993,348 views
407847________
In this video, we take a closer look at a group of Japanese workers using fabric formwork to add a concrete lining to an existing canal leading from a sabo dam. The purpose of this project is to prevent soil erosion and manage water flow in the area, helping protect the surrounding environment. Instead of relying on the traditional rigid formwork method, which would normally take a month to complete, they use fabric formwork, cutting the process down to just two days. This method not only speeds up the project but also reduces labor costs and material use, offering an efficient and sustainable solution for canal construction.
#shorts #japan #construction #fyp
コメント